Wow I can’t believe neither Mark or I have posted anything since the set. We’ve been up in the wilds of Glacier Washington without cell phone service or an internet connection working away on the Method Cabin. We did get a phone last Friday so are slowly rejoining civilization.
I’ve posted a couple of pictures to update progress. We are on pace to be 90% complete before the open house next Sunday the 22nd between 11-4pm.
This is 11 weeks from the start of construction.
It is interesting because it’s been a different experience finishing everything on-site, which confirms the fact that everything is quicker and easier in the controlled environment of our facility. In the future we will be siding all our homes in the factory and using internal straps.
There are several items I’d like to clarify about Method Homes
- Our homes can sit on a normal sized foundation. Our current model is built up because we are in a flood plain.
- Our homes can also sit above daylight basements and garages or first stories.
- Our homes are fully modifiable and can be sided in any material including galvalume, EcoClad, cement board, in addition to different cedar options such as ship lap, board and baton, tongue and groove, all of which can be applied as a rain screen.


