The foundation has been completed and forms stripped. We’ll be spraying the emulsion shortly and prepping the walls with drain mat to protect the house from water intrusion. After that and all drain lines around the footings have been installed we will begin back filling. Check back for updates on site work. It should be buttoning up a week or so prior to the home arriving.
Tags: eco-friendly prefab, lake whatcom, pacific northwest prefab






