Lake Whatcom floor framing done and awaiting Warmboard

This Model 2 Method Cabin floor takes just over a day to frame. The rim is a double LVL with TJI floor joists hung down inside. Both the LVL and the TJI’s are engineered lumber. Once complete and set on the foundation, this floor will be a stronger floor diaphragm than your typical site built home. We secure the three modular floors together treating them as one, and will build these mods together until they are complete, which then we can pull them apart and move them off the shop floor. We will be installing Warmboard on Monday afternoon or Tuesday morning, pending framing inspection Monday morning. Click on any pictures below to enlarge.