The floor inspection has been scheduled for 11am tomorrow. So for today’s post check out the blocking that was added to the floor today per engineering. This was the last thing needed to be done to the floor prior inspection, and this extra detail is called out by the engineer to help with sheer as the mods get delivered and set into position. Also, I took a picture of the waste left over from the floor framing. The drops from most of the engineered lumber can be used for blocking in the ceiling. What can’t be used and must be recycled fit into a trash can. I will also include a picture of the OSI Green Series sub floor adhesive. It has WAY less VOC’s (Volatile Organic Compounds) and chemicals than your normal sub floor glues while still maintaining a high bonding level. Note the FSC (Forest Stewardship Council) block that it is sitting on….some left over FSC framing material from our last project.