Here are some photos of the steel rebar that the foundation crew will form the walls around. The two back walls double as foundation and retaining walls, hence the height. Once poured, these two walls will finish out at 9′ with the front two walls facing the view being flush with grade. This foundation is identical to a site built home style foundation. Because we are already framing in the factory at this point, there is no reason to rush through the foundation. These guys are good!