On Monday in preparation of the slab being poured, rigid insulation was installed in the interior of the foundation. On top of the rigid a steel mesh grid was laid down to strengthen the concrete and have something to tie the radiant tubing to. After the pressure test inspection on the tubing is signed off, we can pour the slab. We are scheduled to pour the slab early next week.