Today we finished the floor sheathing on Lid Park. Not too impressive to look at but thought I'd post some pics none the less. Notice the floors are now 3' in the air so that our insulation company can spray in the 3" of polyurethane foam around the rims of the floor. It will ensure the floors are airtight and add to the insulation R values between floors. Having them up in the air will also be nice for our plumbers on Monday for rough in floor plumbing! There's also some close up shots of the floor where the roof top deck is going. The joists are smaller and cut at a slope for drainage. This will get sheeted with CDX plywood which is different than the other sub floor. The deck will then get a TPO roofing membrane with a built up cedar deck on top.