The weather has turned clear once again just in time to move around some dirt. The Glacier M2 Cabin is scheduled to be set Dec. 9th, one week from tomorrow. Today the preparation prior to backfill happened, including footing drains, gutter drains and water proofing. Here are some pictures I took today, including some of the bolts that will hold the moment frame in place once the modules are set. The moment frame is a steel upside down U that will give the open great room module some engineered strength, which is due to the fact the end of the room is all glass, which according to engineers doesn't provide much strength. The moment frame is already framed and part of the structure sitting in the shop, which will then fit over these bolts that are poured as part of the foundation. This is NOT orthopedic surgery, just a little math and paying attention. And The Mountain was out today! So here we go...