Loading...
Blog
>
Current Post

M2 well under way

October 23, 2009

With the beginning of fall, and torrential down pouring now a daily occurrence in the Pacific Northwest, I am happy to say our crews are safely indoors framing away on Method Homes latest model, the M2. As posted prior, this home is going to Glacier WA and is due to be set around the end of November. This cabin, dubbed the M2, is two Medium cabins from our SML series, that will be connected via a site built entry bridge which will hover somewhere around 2-3 feet off the ground. One of the modules will have the Kitchen, Dining, Living and the other module will consist of two bedrooms and the main bath. The Kitchen module will also have the laundry/mudroom plus a powder bathroom as well. Both have large decks cantilevering off the front including an 8' overhanging eave, much like our Method Cabin. Here are some pictures of the construction in progress and check back soon to see the M2 really start to take shape.

related posts

No items found.

join our newsletter

Join our newsletter for updates about Method Homes and our blog posts.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.