Loading...
Blog
>
Current Post

Method Homes Pittsburgh M2

August 2, 2011

Brian and I just flew back from our set in Pittsburgh. It was a pleasure meeting our clients in person, including their very hospitable family, friends and neighbors ....wonderful people. The set went off without a hitch. The contractor was on site to help us get the modules into the property the day before the set, and had his crew there the day of set to help with coordination. After the crane was finally set up and in position, the set took a little over two hours, with the modules flying gracefully into position on the waiting ICF foundation.The home is a M2 model, like the project we built in Glacier WA. This M2 sits up on top of what will become additional living space below at the walk out basement, along with an art studio for the client. Below are some pictures of the set.We are now leaving today for central Idaho, for the set of the Big Creek Ranch houses. I'll blog about those next week.Also, if you are in southern California come check Method out at Dwell on Design, where I will be part of two panel discussions on modern prefab. The show is June 24th thru 26th.

related posts

No items found.

join our newsletter

Join our newsletter for updates about Method Homes and our blog posts.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.