Loading...
Blog
>
Current Post

Sheetrock hung in Method Factory

September 3, 2009

The sheetrock crew is able to get the entire cabin hung in a day. By next Monday we will be painting and ready for the home stretch of finishes, including tile, cabinetry, trim etc. The sheetrock is comprised of recycled content and it is nice to be able to incorporate it into our homes. The good thing is all you have to do is request it, it is typically the same cost. The ceiling in these pics shows an R-38, formaldehyde free high density bat. This ceiling will have a rough-sawn plywood paneling installed as the finish. Hence the lack of sheetrock.

related posts

No items found.

join our newsletter

Join our newsletter for updates about Method Homes and our blog posts.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.